MCQ Questions Mechanical Engineering Production Technology

Production Technology-2

MCQ Questions Mechanical Engineering Production Technology

Take a look at these MCQ Questions Production Technology for engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Mechanical Engineering Production Technology. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates.

MCQ Questions Mechanical Engineering Production Technology - Set - 2

Question 1: 

For a product layout the material handling equipment must
A. have full flexibility
B. employ conveyor belts, trucks, tractors etc.
C. be a general purpose type
D. be designed as special purpose for a particular application

Correct Answer – (D)

Question 2 : 

ABC analysis deals with
A. analysis of process chart
B. flow of material
C. ordering schedule of job
D. controlling inventory costs money

Correct Answer – (D)

Question 3 : 

Choose the wrong statement. Motion study is used for
A. improving a work method
B. improvising a work method
C. designing a work method
D. reducing inventory costs.

Correct Answer – (D)

Question 4 : 

One time measurement unit (TMU) in method time measurement system equals
A. 0.0001 minute
B. 0.0006 minute
C. 0.006 minute
D. 0.001 minute

Correct Answer – (B)

Question 5 : 

Time study is
A. the appraisal, in terms of time, of the value of work involving human effort
B. machine setting time
C. time taken by workers to do a job
D. method of fixing time for workers

Correct Answer – (A)

MCQ Questions Mechanical Engineering Production Technology

Question 6: 

Process layout is employed for
A. batch production
B. continuous type of product
C. effective utilisation of machines
D. all of the above

Correct Answer – (A)

Question 7: 

Gnat chart provides information about the
A. material handling
B. proper utilization of manpower
C. production schedule
D. efficient working of machine

Correct Answer – (C)

Question 8: 

Basic motion time study gives times for basic motions in ten thousandths of
A. second
B. minute
C. hour
D. day

Correct Answer – (B)

Question 9: 

Work sampling observations are taken on the basis of
A. detailed calculations
B. convenience
C. table of random numbers
D. past experience

Correct Answer – (C)

Question 10: 

TMU in method time measurement stands for
A. time motion unit
B. time measurement unit
C. time movement unit
D. technique measurement unit

Correct Answer – (B)

MCQ Questions Mechanical Engineering Production Technology