Syllabus B Tech Civil Fifth Semester Quantity surveying And Costing CE503

Civil Engineering fifth Semester Syllabus

Syllabus B Tech Civil Fifth Semester Quantity surveying And Costing CE503

The concepts developed in this course will aid in quantification of several concepts in Civil Engineering that have been introduced at the Engineering courses. Technology is being increasingly based on the latest Syllabus B Tech Civil Fifth Semester Quantity surveying And Costing CE503 is given here.

The objective of this course “Syllabus B Tech Civil Fifth Semester Quantity surveying And Costing CE503 is to develop ability and gain insight into the process of problem-solving, with emphasis on thermodynamics. Specially in following manner: Apply conservation principles (mass and energy) to evaluate the performance of simple engineering systems and cycles. Evaluate thermodynamic properties of simple homogeneous substances. Analyze processes and cycles using the second law of thermodynamics to determine maximum efficiency and performance. Discuss the physical relevance of the numerical values for the solutions to specific engineering problems and the physical relevance of the problems in general and Critically evaluate the validity of the numerical solutions for specific engineering problems. More precisely, the objectives are:

  • To enable young technocrats to acquire mathematical knowledge to understand Laplace transformation, Inverse Laplace transformation and Fourier Transform which are used in various branches of engineering.
  • To introduce effective mathematical tools for the Numerical Solutions algebraic and transcendental equations.
  • To acquaint the student with mathematical tools available in Statistics needed in various field of science and engineering.

CE 503 – Quantity Surveying And Costing

Unit 1
Introduction: Purpose and importance of estimates, principles of estimating. Methods of taking out quantities of items of work. Mode of measurement, measurement sheet and abstract sheet; bill of quantities. Types of estimate, plinth area rate, cubical content rate, preliminary, original, revised and supplementary estimates for different projects.
Unit 2
Rate Analysis: Task for average artisan, various factors involved in the rate of an item, material and labour requirement for various trades; preparation for rates of important items of work. Current schedule of rates. (C.S.R.).
Unit 3
Detailed Estimates: Preparing detailed estimates of various types of buildings, R.C.C. works, earth work calculations for roads and estimating of culverts Services for building such as water supply, drainage and electrification.
Unit 4
Cost of Works: Factors affecting cost of work, overhead charges, Contingencies and work charge establishment, various percentages for different services in building. Preparation of DPR.
Unit 5
Valuation: Purposes, depreciation, sinking fund, scrap value, year’s purchase, gross and net income, dual rate interest, methods of valuation, rent fixation of buildings.

Books Recommended

1. Quantity Surveying & Costing – B.N. Datta
2. Estimating & Costing for Civil Engg. – G.S. Birdi
3. Quantity surveying & costing – Chakraborty
4. Estimating & Costing – S.C. Rangawala.