MCQ Questions Civil Engineering Tunnel Engineering

MCQ Questions Civil Engineering Tunnel Engineering-2

MCQ Questions Civil Engineering Tunnel Engineering

Take a look at these MCQ Questions Civil Engineering Tunnel Engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Civil Engineering Tunnel Engineering. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates. Other topics on Civil Engineering Multiple Choice Questions can be accessed 

MCQ Questions Civil Engineering Tunnel Engineering - Set - 2

Question 1: 

In Belgium method of tunnelling
a) construction of side walls is completed before invert and roof arch are built.
b) construction of roof arch is completed before side walls and invert are built.
c) construction of invert is completed before side walls and roof arch are built.
d) construction of invert and side walls is completed before roof arch is built.

Correct Answer – (B)

Question 2 : 

The needle beam method of tunneling
(i) is suitable for soils in which roof can stand for few minutes without support
(ii) is suitable for brick lining
(iii) is suitable for concrete lining
(iv) requires large number of trench jacks Of these statements
a) only (i) is correct
b) (i), (ii) and (iv) are correct
c) (i), (iii) and (iv) are correct
d) (i) and (ii) are correct

Correct Answer – (B)

Question 3 : 

Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than
a) 2 m
b) 3 m
c) 4 m
d) 5 m

Correct Answer – (B)

Question 4 : 

If ‘D’ is the diameter of tunnel in metres, then the thickness of lining in mm, as per the empirical formula is given by
a) 42 D
b) 82 D
c) 104 D
d) 124 D

Correct Answer – (B)

Question 5 : 

American method of tunneling
i) is suitable for large sized tunnels
ii) is no,’ suitable for railway or highway tunnel’s
iii) requires heavy timbers Of these statements
a) only (i) is correct
b) (i) and (iii) are correct
c) (ii) and (iii) are correct
d) (i) and (ii) are correct

Correct Answer – (A)

MCQ Questions Civil Engineering Tunnel Engineering

Question 6: 

Which of the following methods of tunneling is used for long tunnels at great depths ?
a) Army method
b) Needle beam method
c) Austrian method
d) English method

Correct Answer – (C)

Question 7: 

The most suitable soil for compressed air tunneling is
a) silt
b) sand
c) clay
d) gravel

Correct Answer – (C)

Question 8: 

Which one of the following tunnelling methods is used for laying under ground sewers ?
a) Needle beam method
b) Army method
c) German method
d) Italian method

Correct Answer – (B)

Question 9: 

Which of the following lining material is useful for shield driven tunnels in sub aqueous regions ?
a) stone masonry
b) timber
c) cast iron
d) cement concrete

Correct Answer – (C)

Question 10: 

Assertion A : English method of tunneling requires more time as compared to other methods of tunneling.
Reason R : In English method of tunneling, the masons and excavators have to work alternately.
Select your answer based on the coding system given below :
a) Both A and R are true and R is the correct explanation of A.
b) Both A and R are true and R is not the correct explanation of A.
c) A is true but R is false.
d) A is false but R is true.

Correct Answer – (A)