Take a look at these MCQ Questions Civil Engineering Tunnel Engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Civil Engineering Tunnel Engineering. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates. Other topics on Civil Engineering Multiple Choice Questions can be accessed 

MCQ Questions Civil Engineering Tunnel Engineering - Set - 3

Question 1: 

Assertion A: When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock.

Reason R: A tunnel through rock, hard or soft, does not need any concrete lining

Select your answer based on the coding system given below:

(A) Both A and R is true and R is the correct explanation of A

(B) Both A and R is true but R is not the correct explanation of A

(C) A is true but R is false

(D) A is false but R is true

Correct Answer – (C)

Question 2 : 

Which of the following lining material is useful for shield driven tunnels in sub aqueous regions?
(A) Stone masonry

(B) Timber

(C) Cast iron

(D) Cement concrete

 

Correct Answer – (C)

Question 3 : 

Which one of the following is a component of a shield for tunnelling ?
a) liner plate
b) trench jack
c) stiffener
d) cutting edge

Correct Answer – (D)

Question 4 : 

Which one of the following is considered to be an advantage of the heading and benching method of tunnel construction?
a) It is suitable for construction in unstable rocks.
b) In this method, it is easy to install timber support.
c) Tunnelling can be continuous and the work can be expedited.
d) In case of excessive water, it is easy to take correct steps.

Correct Answer – (C)

Question 5 : 

Drift method of tunneling is used to construct tunnels in
a) soft grounds
b) rock
c) self supporting grounds
d) broken grounds

Correct Answer – (B)

MCQ Questions Civil Engineering Tunnel Engineering

Question 6: 

Drift method of tunneling is used to construct tunnels in

(A) Soft grounds
(B) Rock
(C) Self supporting grounds
(D) Broken grounds

Correct Answer – (B)

Question 7: 

Assertion A : When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock.
Reason R : A tunnel through rock, hard or soft, does not need any concrete lining.
Select your answer based on the coding system given below:
a) Both A and R are true and R is the correct explanation of A.
b) Both A and R are true but R is not the correct explanation of A.
c) A is true but R is false.
d) A is false but R is true.

Correct Answer – (C)

Question 8: 

In “full face” method of constructing tunnels, the first operation relates to
a) removal of bottom portion
b) excavation of one drift in the centre
c) removal of top portion
d) excavation being done along the periphery

Correct Answer – (D)

Question 9: 

Consider the following situations.
1. Soil is soft.
2. Volume of existing surface traffic on the alignment is heavy.
3. Track is at a deeper level.
4. Water table is high.
In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at
a) 1 and 2
b) 1 and 3
c) 1 and 4
d) 2 and 3

Correct Answer – (C)

Question 10: 

What is the correct sequence of the following events in rock tunnelling?
1. marking tunnel profile
2. loading explosives and blasting
3. checking misfire
4. mucking
5. removing foul gas
6. setting up and drilling
7. guniting
Select the correct answer using the codes given below.
Codes:
a) 1,6,5,3,4,2,7
b) 1,2,6,3,5,4,7
c) 1, 6,2, 5,4, 3, 7
d) 1,6,2,5,3,4,7

Correct Answer – (C)