MCQ Questions Civil Engineering Tunnel Engineering

MCQ Questions Civil Engineering Tunnel Engineering-1

MCQ Questions Civil Engineering Tunnel Engineering

Take a look at these MCQ Questions Civil Engineering Tunnel Engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Civil Engineering Tunnel Engineering. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates. Other topics on Civil Engineering Multiple Choice Questions can be accessed 

MCQ Questions Civil Engineering Tunnel Engineering - Set - 1

Question 1: 

In compressed air tunneling, the volume of free air provided is
a) 6 mJ per second per m2 of face area
b) 6 mJ per minute per m2 of face area
c) 20 mJ per minute per m2 of face area
d) 6 mJ per hour per m2 of face area

Correct Answer – (B)

Question 2 : 

The correct sequence of drilling equipment for increasing size of holes in tunnels is
a) wagon drill, churn drill, shot drill
b) wagon drill, shot drill, churn drill
c) shot drill, churn drill, wagon drill
d) churn drill, wagon drill, shot drill

Correct Answer – (A)

Question 3 : 

Drifters can be used to drill
a) only up holes
b) only down holes
c) horizontal or up holes
d) horizor„al, down or up holes

Correct Answer – (D)

Question 4 : 

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield
a) remains same
b) decreases
c) increases by 2.25 times
d) increases by 3.5 times

Correct Answer – (C)

Question 5 : 

What is the correct sequence of the following events of construction of a shaft in rock ?
1. drilling and blasting
2. timbering
3. pumping
4. mucking
Select the correct answer using the codes given below Codes :
a) 1,2,3,4
b) 1,4,2,3
c) 2,1,4,3
d) 2,4,1,3

Correct Answer – (B)

MCQ Questions Civil Engineering Tunnel Engineering

Question 6: 

Which of the following is not a component of the shield ?
a) propelling jacks
b) liner plate
c) hood
d) tail

Correct Answer – (B)

Question 7: 

If ‘N’ is the number of shafts used, then the total number of feces available for attacking the excavation and construction in tunnels are
a) 2N
b) N + 2
c) 2 N + 1
d) 2 N + 2

Correct Answer – (D)

Question 8: 

Which of the following are percussion drills ?
(i) shot drill
(ii) diamond drill
(iii) wagon drill
(iv) churn drill Of these statements
a) (i) and (ii) are correct
b) (iii) and (iv) are coiTect
c) (i) and (iv) are correct
d) (ii) and (iii) are correct

Correct Answer – (B)

Question 9: 

A good blast with a good yield is obtained if the cut hole is
a) normal to face
b) inclined at 45° to the face
c) inclined at 15° to the face
d) inclined at 30° to the face

Correct Answer – (B)

Question 10: 

Circular section of tunnels is not suitable for
a) carrying water
b) non-cohesive soils
c) tunnels driven by shield method
d) placement of concrete lining

Correct Answer – (D)

MCQ Questions Civil Engineering Tunnel Engineering
MCQ Questions Civil Engineering Docks And Harbour Engineering

Multiple Choice Questions for Competitive Exams