MCQ Questions Mechanical Engineering Production Technology

Production Technology-

MCQ Questions Mechanical Engineering Production Technology

Take a look at these MCQ Questions Production Technology for engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Mechanical Engineering Production Technology. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates.

MCQ Questions Mechanical Engineering Production Technology - Set - 1

Question 1: 

Per cent idle time for men or machines is found by
A. work sampling
B. time study
C. method study
D. work study

Correct Answer – (A)

Question 2 : 

Job evaluation is the method-of determining the
A. relative worth of jobs
B. skills required by a worker
C. contribution of a worker
D. contribution of a job

Correct Answer – (A)

Question 3 : 

Expediting function consists in keeping a watch on
A. operator’s activity
B. flow of material and in case of trouble locate source of trouble
C. minimising the delays
D. making efficient despatching

Correct Answer – (B)

Question 4 : 

Work study is done with the help of
A. process chart
B. material handling
C. stop watch
D. all of the above

Correct Answer – (C)

Question 5 : 

Micromotion study involves following number of fundamental hand motions
A. 8
B. 12
C. 16
D. 20

Correct Answer – (C)

MCQ Questions Mechanical Engineering Production Technology

Question 6: 

Micro motion study is
A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously

Correct Answer – (A)

Question 7: 

Choose the wrong statement Time study is used to
A. determine overhead expenses
B. provide a basis for setting piece prices or incentive wages
C. determine standard costs
D. determine the capability of an operator to handle the number of machines

Correct Answer – (A)

Question 8: 

Scheduling gives information about
A. when work should start and how much work should be completed during a certain period
B. when work should complete
C. that how idle time can be minimized
D. proper utilisation of machines

Correct Answer – (A)

Question 9: 

The standard time for a job is
A. total work content
B. base time + relaxation time
C. total work content + basic time
D. total work content + delay contingency allowance

Correct Answer – (D)

Question 10: 

The allowed time for a job equals standard time plus
A. policy allowance
B. interference allowance
C. process allowance
D. learning allowance

Correct Answer – (A)

MCQ Questions Mechanical Engineering Production Technology
MCQ Questions Mechanical Engineering Nuclear Power Plants

Multiple Choice Questions for Competitive Exams