MCQ Questions Civil Engineering Docks And Harbour Engineering

MCQ Questions Civil Engineering Docks And Harbour Engineering-2

MCQ Questions Civil Engineering Design of Masonry Structures

Take a look at these MCQ Questions Civil Engineering Docks And Harbour Engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Civil Engineering Docks And Harbour Engineering. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates. Other topics on Civil Engineering Multiple Choice Questions can be accessed 

MCQ Questions Civil Engineering Docks And Harbour Engineering - Set - 2

Question 1: 

Assertion A : Basin walls have to be of much grater height than dock walls.
Reason R : Tidal basins are subject to fluctuations of levels due to tidal variations.
Select your answer based on the coding system given below:
a) Both A and R are true and R is the correct explanation of A.
b) Both A and R are true but R is not correct explanation of A.
c) A is true but R is false.
d) A is false but R is true.

Correct Answer – (A)

Question 2 : 

If the maximum spring rise is 2 m and height of the waves expected is 4 m , then the breakwater height above the datum will be
a) 2.5 m
b) 4 m
c) 5 m
d) 7 m

Correct Answer – (D)

Question 3 : 

As compared to wall type breakwater, mound type breakwater
a) requires skilled labour
b) requires low maintenance cost
c) requires less material
d) results in less damage due to gradual failure

Correct Answer – (D)

Question 4 : 

Select the incorrect statement.
a) The progress of work in low level method of mound construction is very slow.
b) Barge method of mound construction is economical.
c) In low level method of mound construction, the area of working is limited.
d) In staging method of mound cons-truction, the work is not interrupted even during stormy weather.

Correct Answer – (B)

Question 5 : 

In a two lane channel, bottom width of channel is given by
a) Manoeuvring lane + 2 x Bank clearance lane
b) 2 x Manoeuvring lane + 2 x Bank clearance lane
c) 2 x Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
d) Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane

Correct Answer – (C)

MCQ Questions Civil Engineering Docks And Harbour Engineering

Question 6: 

If H is the height of the wave expected, then the height of the breakwater is generally taken as
a) 1.2 H to 1.25 H above the datum
b) 1.2 H to 1.25 H above the low water level
c) 1.2 H to 1.25 H above the high water level
d) 1.2 H to 1.25 H above the mean sea level

Correct Answer – (C)

Question 7: 

The difference in height between highest high water and lowest low water is called
a) mean range
b) maximum range
c) maximum rise
d) mean rise

Correct Answer – (B)

Question 8: 

Assertion A : Marine structures are made specially bulky and strong.
Reason R : Sea insects result in undermining of the hardest and the soundest building material. Select your answer based on the coding system given below:
a) Both A and R are true and R is the correct explanation of A.
b) Both A and R are true but R is not the correct explanation of A.
c) A is true but R is false.
d) A is false but R is true.

Correct Answer – (A)

Question 9: 

Minimum width of ship clearance shall be
a) B or 30 m
b) 1.5 B or 50 m
c) 1.5 B
d) 50 m
where “B” is beam of the design vessel

Correct Answer – (A)

Question 10: 

At a given port, the fetch is 400 nautical miles, the maximum height of storm wave will be
a) 2.073 m
b) 8.169 m
c) 9.144 m
d) 6.8 m

Correct Answer – (C)

MCQ Questions Civil Engineering Docks And Harbour Engineering
MCQ Questions Civil Engineering Design of Masonry Structures

Multiple Choice Questions for Competitive Exams