MCQ Questions Civil Engineering Docks And Harbour Engineering

MCQ Questions Civil Engineering Docks And Harbour Engineering-3

MCQ Questions Civil Engineering Design of Masonry Structures

Take a look at these MCQ Questions Civil Engineering Docks And Harbour Engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Civil Engineering Docks And Harbour Engineering. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates. Other topics on Civil Engineering Multiple Choice Questions can be accessed 

MCQ Questions Civil Engineering Docks And Harbour Engineering - Set - 3

Question 1: 

Which of the following structures protects the shore by trapping of littoral drift?
a) groynes
b) sea walls
c) revetments
d) moles

Correct Answer – (A)

Question 2 : 

Assertion A : Large size stones are required in stone revetment in shore protection.
Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone.
Select your answer based on the coding system given below.
a) Both A and R are true and R is the correct explanation of A.
b) Both A and R are true but R is not a correct explanation of A.
c) A is true but R is false.
d) A is false but R is true.

Correct Answer – (A)

Question 3 : 

Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?
a) sea walls, bulk heads and groynes
b) sea walls, bulk heads and revetments
c) sea walls, revetments and groynes
d) bulk heads, revetments and groynes

Correct Answer – (B)

Question 4 : 

If Hs is the significant wave height, then the average wave height and highest wave height respectively are given by
a) 0.6 Hs and 1.67 Hs
b) 0.6 Hs and 1.87 Hs
c) 1.27 Hs and 1.87 Hs
d) 1.27 Hs and 1.67 Hs

Correct Answer – (B)

Question 5 : 

Which of the following is a fixed type mooring accessory ?
a) bollard
b) buoys
c) cables
d) anchors

Correct Answer – (A)

MCQ Questions Civil Engineering Docks And Harbour Engineering

Question 6: 

Which of the following are repair docks ?
a) marine railways, dry docks, floating docks, wet docks
b) dry docks, wet docks, floating docks, lift docks
c) wet docks, floating docks, lift docks, marine railways
d) wet docks, lift docks, marine railways, dry docks

Correct Answer – (C)

Question 7: 

Which of the following type of sea walls results in greatest protection of shore structures?
a) vertical sea wall
b) sea wall with batter
c) stepped sea wall
d) sea wall with concave face

Correct Answer – (D)

Question 8: 

When a wave strikes a vertical breakwater in deep water, it is reflected back and on meeting another advancing wave of similar amplitude merges and rises vertically in a wall of water. This phenomenon is called
a) Surf
b) Clapotis
c) Fetch
d) Swell

Correct Answer – (B)

Question 9: 

The significant wave height is defined is the average height of the
a) one – third highest waves
b) one – fourth highest waves
c) one – fifth highest waves
d) one – tenth highest waves

Correct Answer – (A)

Question 10: 

By increasing the rise of lockgates,
(i) the length of the lock gate will increase
(ii) transverse stress due to water pressure on the gate will increase
(iii) compressive force on the gate will increase Of these statements
a) (i) and (ii) are correct
b) (i) and (iii) are correct
c) Only (ii) is correct
d) Only (iii) is correct

Correct Answer – (A)

MCQ Questions Civil Engineering Docks And Harbour Engineering
MCQ Questions Civil Engineering Design of Masonry Structures

Multiple Choice Questions for Competitive Exams