Syllabus B Tech Civil Fifth Semester Construction planning and management CE503

Civil Engineering fifth Semester Syllabus

Syllabus B Tech Civil Fifth Semester Construction planning and management CE503

The concepts developed in this course will aid in quantification of several concepts in Civil Engineering that have been introduced at the Engineering courses. Technology is being increasingly based on the latest Syllabus B Tech Civil Fifth Semester Construction planning and management CE503 is given here.

The objective of this course “Syllabus B Tech Civil Fifth Semester Construction planning and management CE503 is to develop ability and gain insight into the process of problem-solving, with emphasis on thermodynamics. Specially in following manner: Apply conservation principles (mass and energy) to evaluate the performance of simple engineering systems and cycles. Evaluate thermodynamic properties of simple homogeneous substances. Analyze processes and cycles using the second law of thermodynamics to determine maximum efficiency and performance. Discuss the physical relevance of the numerical values for the solutions to specific engineering problems and the physical relevance of the problems in general and Critically evaluate the validity of the numerical solutions for specific engineering problems. More precisely, the objectives are:

  • To enable young technocrats to acquire mathematical knowledge to understand Laplace transformation, Inverse Laplace transformation and Fourier Transform which are used in various branches of engineering.
  • To introduce effective mathematical tools for the Numerical Solutions algebraic and transcendental equations.
  • To acquaint the student with mathematical tools available in Statistics needed in various field of science and engineering.

CE 503 – Construction Planning and Management

Unit 1
Preliminary and detailed investigation methods: Methods of construction, form work and centering. Schedule of construction, job layout, principles of construction management, modern management techniques like CPM/PERT with network analysis.
Unit 2
Construction equipment: Factors affecting selection, investment and operating cost, output of various equipment, brief study of equipment required for various jobs such as earth work, dredging, conveyance, concreting, hoisting, pile driving, compaction and grouting.
Unit 3
Contracts: Different types of controls, notice inviting tenders, contract document, departmental method of construction, rate list, security deposit and earnest money, conditions of contract, arbitration, administrative approval, technical sanction.
Unit 4
Specifications & Public Works Accounts: Importance, types of specifications, specifications for various trades of engineering works. Various forms used in construction works, measurement book, cash book, materials at site account, imprest account, tools and plants, various types of running bills, secured advance, final bill.
Unit 5
Site Organization & Systems Approach to Planning: Accommodation of site staff, contractor’s staff, various organization charts and manuals, personnel in construction, welfare facilities, labour laws and human relations, safety engineering. Problem of equipment management, assignment model, transportation model and waiting line modals with their applications, shovel truck performance with waiting line method.

Books Recommended

1. Construction Equipment by Peurify
2. CPM by L.S. Srinath
3. Construction Management by S. Seetharaman
4. CPM & PERT by Weist & Levy
5. Construction, Management & Accounts by Harpal Singh
6. Tendering & Contracts by T.A. Talpasai.