MCQ Questions Civil Engineering Highway Engineering

MCQ Questions Civil Engineering Highway Engineering-2

MCQ Questions Civil Engineering Highway Engineering

Take a look at these MCQ Questions Civil Engineering Highway Engineering interview questions and our tips on how to answer them. If you’re applying for an engineering internship, graduate scheme or entry-level job, you’ll face at least one interview as part of an engineering employer’s recruitment process. You may be interviewed by one or more members of the HR team, senior members of the engineering team you’d be joining or a mixture of both. In this section we will study MCQ Questions Civil Engineering Highway Engineering. 
As well as questions about your reasons for applying to the role and the employer in question, engineering recruiters will be assessing your potential in the areas that is crucial to any engineering role: technical expertise. Engineers may be asked to perform feats of fantastic technical prowess, but it will be as as part of a Justice League rather than as a solo engineering super hero.
 

The interviewer is almost as nervous as the candidate in most interviews. You might wonder if you look confident enough, if you will hire the right person, or if you are asking the right engineering interview questions. The last question is arguably the most crucial part to worry about when you’re interviewing candidates. Other topics on Civil Engineering Multiple Choice Questions can be accessed 

MCQ Questions Civil Engineering Highway Engineering - Set -

Question 1: 

If b is the wheel track of a vehicle and h is the height of centre of gravity above road surface, then to avoid overturning and lateral skidding on a horizontal curve, the centrifugal ratio should always be
A. less than b/2h and greater than co-efficient of lateral friction
B. less than b/2h and also less than co-efficient of lateral friction
C. greater than b/2h and less than co-efficient of lateral friction
D. greater than b/2h and also greater than coefficient of lateral friction

Correct Answer – (B)

Question 2 : 

The ruling design speed on a National Highway in plain terrain as per IRC recommendations is
A. 60 kmph
B. 80 kmph
C. 100 kmph
D. 120 kmph

Correct Answer – (C)

Question 3 : 

If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is
A. 30m
B. 60m
C. 120m
D. 180m

Correct Answer – (B)

Question 4 : 

Stopping sight distance is always
A. less than overtaking sight distance
B. equal to overtaking sight distance
C. more than overtaking sight distance
D. none of the above

Correct Answer – (A)

Question 5 : 

On a single lane road with two way traffic, the minimum stopping sight distance is equal to
A. stopping distance
B. two times the stopping distance
C. half the stopping distance
D. three times the stopping distance

Correct Answer – (B)

MCQ Questions Civil Engineering Highway Engineering

Question 6: 

The terrain may be classified as rolling terrain if the cross slope of land is
A. upto 10%
B. between 10% and 25%
C. between 25% and 60%
D. more than 60%

Correct Answer – (B)

Question 7: 

The effect of grade on safe overtaking sight distance is
A. to increase it on descending grades and to decrease it on ascending grades
B. to decrease it on descending grades and to increase it on ascending grades
C. to increase it on both descending and ascending grades
D. to decrease it on both descending and ascending grades

Correct Answer – (C)

Question 8: 

Reaction time of a driver
A. increases with increase in speed
B. decreases with increase in speed
C. is same for all speeds
D. none of the above

Correct Answer – (B)

Question 9: 

The desirable length of overtaking zone as per IRC recommendation is equal to
A. overtaking sight distance
B. two times the overtaking sight distance
C. three times the overtaking sight distance
D. five times the overtaking sight distance

Correct Answer – (D)

Question 10: 

Compared to a level surface, on a descending gradient the stopping sight distance is
A. less
B. more
C. same
D. dependent on the speed

Correct Answer – (B)